NICET Fire Alarm Systems Level I, Submittal Preparation and System Layout (Technical Documents): all 18 questions
All questions from the Submittal Preparation and System Layout (Technical Documents) section for NICET Fire Alarm Systems Level I, each with the correct answer.
- 3001A floor plan is drawn at a scale of 1/8 in = 1 ft. On the drawing, the distance between two detectors measures 3.5 in. What is the real distance?
- 3002On a drawing with a scale of 1/4 in = 1 ft, a corridor measures 6 in long. How long is the corridor?
- 3003Where on a set of fire alarm drawings should you look first to find out what a device symbol means?
- 3004Which fire alarm drawing shows the vertical arrangement of panels, risers and circuits floor by floor?
- 3005Which document shows what each input does to each output, for example which detector shuts down which fan?
- 3006On fire alarm drawings, what does the abbreviation SLC stand for?
- 3007A note on a plan says a manual box is mounted at 48 in. AFF. What does AFF mean?
- 3008In the CSI MasterFormat used for construction specifications, where is the fire detection and alarm section found?
- 3009Before installation begins, what normally has to happen with fire alarm shop drawings?
- 3010Which document is completed at the end of a new installation to record the system's details and test results?
- 3011What are record drawings (as-builts)?
- 3012Where must system record documents be stored on site?
- 3013The plans show a smoke detector right in front of an HVAC supply diffuser that was moved in the field. What should a Level I technician do?
- 3014Where would you look to find a strobe's current draw at each candela setting?
- 3015What is the main purpose of the title block on a drawing sheet?
- 3016Two sheets of the same drawing set show different revision letters, B and D. Which should you install from?
- 3017Which symbol type on a fire alarm floor plan most likely shows a wall-mounted horn/strobe?
- 3018Which document should be followed for wiring terminals and settings of a specific device when the plans do not show them?