Question 4028 of 344 · NICET Fire Alarm Systems Level II

A wire takeoff from the drawings measures 2,400 ft of cable. The supervisor adds 10 percent for waste and routing. How much cable should be ordered?

Exactly one answer is correct.

Show solution

Correct answer to question 4028

  • B: 2,640 ft

Explanation

Order quantity = 2,400 x 1.10 = 2,640 ft. Adding an allowance covers vertical drops, service loops, and offsets that a plan measurement does not show.