NICET Fire Alarm Systems Level II, Management and Supervision: all 35 questions
All questions from the Management and Supervision section for NICET Fire Alarm Systems Level II, each with the correct answer.
- 4001When a portable ladder is used to reach an upper landing, how far must its side rails extend above the landing?
- 4002A non self supporting ladder is 16 ft long from base to support point. How far should the base be from the wall?
- 4003In construction, at what height above a lower level must workers on unprotected sides and edges have fall protection?
- 4004At what height do workers on a scaffold need fall protection under OSHA construction rules?
- 4005A technician must service a 120 V circuit feeding a fire alarm booster power supply. Under OSHA lockout/tagout rules, who may remove the lock afterward?
- 4006Which receptacles on a construction site need ground fault protection under OSHA when an assured equipment grounding program is not used?
- 4007A technician must enter a below grade vault with limited entry and possible hazardous atmosphere to reach a junction box. What applies?
- 4008Where must safety data sheets for chemicals used on a job, such as aerosol smoke or cleaning solvents, be available?
- 4009Which practice is prohibited when using a stepladder?
- 4010A technician uses a boom lift to install beam detectors. What fall protection is required?
- 4011What minimum clearance should be kept from overhead power lines of 50 kV or less when working with ladders or equipment?
- 4012A crew must work near exposed energized parts in an electrical room. Which ladder type should be used?
- 4013Under AIA A201 (2017), what does the architect's review of shop drawings check?
- 4014Under AIA A201 (2017), what must the contractor do before submitting shop drawings to the architect?
- 4015Under AIA A201 (2017), which document changes the contract sum or time and is signed by the owner, contractor, and architect?
- 4016Under AIA A201 (2017), what allows the owner to direct a change before the price is agreed?
- 4017Under AIA A201 (2017), who may order a minor change in the work that does not change the contract sum or time?
- 4018Under AIA A201 (2017), within how many days after the event must a claim normally be started?
- 4019Under AIA A201 (2017), how long is the correction period after substantial completion?
- 4020Under AIA A201 (2017), who is solely responsible for construction means, methods, techniques, sequences, and procedures?
- 4021Under AIA A201 (2017), what may the architect do with a submittal that the contract documents do not require?
- 4022A Level II technician finds a conflict between the fire alarm drawings and the ceiling plan. What is the correct way to resolve it?
- 4023Before acceptance testing of elevator recall and shunt trip, which coordination is needed?
- 4024On a new building, which trade usually installs the sprinkler waterflow and tamper switches that the fire alarm contractor then wires?
- 4025Smoke detectors are installed while drywall sanding is still going on. What should the supervisor arrange?
- 4026Under the International Fire Code, a required fire alarm system is out of service. What must happen?
- 4027On a project schedule, what is the critical path?
- 4028A wire takeoff from the drawings measures 2,400 ft of cable. The supervisor adds 10 percent for waste and routing. How much cable should be ordered?
- 4029A project has 120 devices. Each takes about 0.75 labor hours to install and terminate. With a crew of two technicians, how many working hours will it take?
- 4030Why should fire alarm devices and equipment be ordered only after the submittals are approved?
- 4031Which qualification does NFPA 72 accept for personnel who perform inspection, testing, and maintenance?
- 4032At the start of each work day on a fire alarm job, which supervisor action best supports safe and efficient work?
- 4033A customer asks the technician to disable a nuisance detector permanently. What should the supervisor do?
- 4034Which record helps a supervisor prove what work was done on a given day on site?
- 4035A crew must braze a pipe support near an area with active smoke detectors. Which step should the supervisor arrange first?