Question 2082 of 297 · NICET Fire Alarm Systems Level III
Which statement about the presignal feature is correct?
Exactly one answer is correct.
You got of questions right. Here on the question pages nobody remembers which ones you got wrong. The trainer saves your progress and asks the mistakes again until they stick.
Or free: the 10 questions most people get wrong
Show solution
Correct answer to question 2082
- D: It needs AHJ approval, and the first signal goes to trained staff
Explanation
Presignal sends the initial alarm only to designated staff and delays general notification, which is why it requires AHJ approval and trained personnel. It is distinct from positive alarm sequence, which has fixed time limits.
More questions: Maintenance
- 2083The owner wants to stop the annual test of the elevator recall because it disrupts tenants. What should you advise?
- 2084During the annual inspection the record documentation cabinet is empty and the owner cannot find the drawings. What should the Level III recommend?
- 2085An existing system tests correctly, but you notice the building's occupancy changed from offices to a daycare. What should your report recommend?
- 2086Which action best prevents unintentional alarm transmission when a technician must replace a detector on a monitored system?
- 2087Which of these is the correct sequence when a deficiency found during inspection cannot be fixed on the spot?
- 2088Which measurement is typically used when sound pressure levels are verified after a renovation?