Question 4023 of 344 · NICET Fire Alarm Systems Level II
Before acceptance testing of elevator recall and shunt trip, which coordination is needed?
Exactly one answer is correct.
You got of questions right. Here on the question pages nobody remembers which ones you got wrong. The trainer saves your progress and asks the mistakes again until they stick.
Or free: the 10 questions most people get wrong
Show solution
Correct answer to question 4023
- A: Schedule the elevator contractor and inspector to be present
Explanation
Elevator recall and power shutdown involve the elevator controller, so the elevator contractor and often the elevator inspector must attend. Testing alone can damage equipment or leave cars out of service.
More questions: Management and Supervision
- 4024On a new building, which trade usually installs the sprinkler waterflow and tamper switches that the fire alarm contractor then wires?
- 4025Smoke detectors are installed while drywall sanding is still going on. What should the supervisor arrange?
- 4026Under the International Fire Code, a required fire alarm system is out of service. What must happen?
- 4027On a project schedule, what is the critical path?
- 4028A wire takeoff from the drawings measures 2,400 ft of cable. The supervisor adds 10 percent for waste and routing. How much cable should be ordered?
- 4029A project has 120 devices. Each takes about 0.75 labor hours to install and terminate. With a crew of two technicians, how many working hours will it take?