Question 3017 of 297 · NICET Fire Alarm Systems Level III
A warehouse ceiling has beams 24 in deep and 10 ft on center. How should heat detection be laid out?
Exactly one answer is correct.
You got of questions right. Here on the question pages nobody remembers which ones you got wrong. The trainer saves your progress and asks the mistakes again until they stick.
Or free: the 10 questions most people get wrong
Show solution
Correct answer to question 3017
- B: Treat each bay as a separate area needing detection
Explanation
When beams are deeper than 18 in and spaced more than 8 ft on center, each bay is a separate area, and detectors are laid out in each bay. Shallower beams use the two-thirds reduction instead.
More questions: Submittal Preparation and System Layout
- 3018A sloped ceiling rises 2 ft over a horizontal run of 10 ft. Is it a sloping ceiling under NFPA 72 detector placement rules?
- 3019For a peaked ceiling, where must the first row of spot detectors be located?
- 3020When laying out detectors on a sloped ceiling, which dimension is used for spacing beyond the first row?
- 3021Per NFPA 72 Table 18.5.5.4.1(a), which effective intensity is required for a single wall-mounted strobe in a 30 ft by 30 ft room?
- 3022A conference room is 38 ft by 40 ft. Using one wall-mounted strobe per the room spacing table, which minimum rating would you pick?
- 3023In a corridor 10 ft wide and 180 ft long, how must visible appliances be spaced?