A project includes work in an occupied hospital. Which item should be part of the project plan before work begins?
Exactly one answer is correct.
You got of questions right. Here on the question pages nobody remembers which ones you got wrong. The trainer saves your progress and asks the mistakes again until they stick.
Or free: the 10 questions most people get wrong
Show solution
Correct answer to question 1098
- A: An impairment and phasing plan that keeps occupied areas protected
Explanation
In occupied buildings, especially health care, the fire alarm must remain in service as much as possible. A phasing plan with impairment procedures, fire watch arrangements and notifications keeps occupants protected and the AHJ informed.
More questions: Installation, Planning and Maintenance Management
- 1099A company plans its first ERCES installation. Before bidding, which department level decision is most important?
- 1100Which scheduling format shows each activity as a horizontal bar against a calendar, but does not clearly show the logic links between activities?
- 1001A hospital addition ties a new fire alarm network node into the existing campus system, smoke control, elevator recall and door release. Which document governs the testing that proves these interconnected systems work together as intended?
- 1002On a commissioning project, which document is written by the design team to explain how the owner's project requirements will be met, including code basis, assumptions and system descriptions?
- 1003Under the commissioning process described in NFPA 3, who normally develops the owner's project requirements (OPR)?
- 1004Six addressable smoke detectors are added to an existing loop, and the program is edited to map them to an existing elevator recall output. What reacceptance testing is required?