NICET Fire Alarm Systems Level IV, Submittals, Shop Drawings and Records: all 34 questions
All questions from the Submittals, Shop Drawings and Records section for NICET Fire Alarm Systems Level IV, each with the correct answer.
- 2001You are reviewing a fire alarm submittal before it goes to the building official. Which item does the IBC require on fire alarm shop drawings?
- 2002A submittal shows strobe locations but no candela settings. Under the IBC shop drawing requirements, how should the reviewer respond?
- 2003Under NFPA 72, which item belongs to the minimum documentation required for every new system?
- 2004Which format does NFPA 72 accept for the sequence of operation in the system documentation?
- 2005You are approving shop drawings drawn by a Level II technician. Which check is most important to confirm the drawings meet NFPA 72 documentation rules?
- 2006A reviewer stamps shop drawings with a status that lets the contractor proceed, provided the marked corrections are made, without a resubmittal. Which status is this?
- 2007A contractor submits a different manufacturer's speaker than the one in the specification as an equal. What must happen before it can be installed?
- 2008A control unit draws 1.8 A in standby and 6.5 A in alarm. Using 24 hours of standby, 5 minutes of alarm and the 1.25 aging correction factor of NFPA 72 (2022/2025), what minimum battery capacity results?
- 2009A voice evacuation panel draws 2.1 A in standby and 14 A in alarm at full connected load. Without any margin, what battery capacity is needed for 24 hours of standby followed by the required alarm duration for an emergency voice system?
- 2010A NAC uses 14 AWG solid copper with 3.07 ohms per 1,000 ft, runs 300 ft to the last appliance and carries 2.0 A, assumed lumped at the end. Starting from 20.4 V at end of battery life, what voltage is at the last appliance?
- 2011A NAC must carry 2.5 A to the end of a 400 ft run, and the voltage may drop no more than 4.4 V. Using solid copper resistances of 3.07 ohms (14 AWG), 1.93 ohms (12 AWG) and 1.21 ohms (10 AWG) per 1,000 ft, what is the smallest conductor that works?
- 2012A shop drawing shows a single wall mounted strobe in a 40 ft by 40 ft conference room. What is the minimum effective intensity for that appliance based on the NFPA 72 room spacing table?
- 2013Where must the system record documents be stored?
- 2014The documentation cabinet for a high-rise is placed in the engineering office instead of at the fire command center. What must be provided at the control unit?
- 2016How long must the record of completion and the record drawings be retained?
- 2017How long must records of a periodic inspection and test be kept under NFPA 72?
- 2018Which statement about the form of NFPA 72 records is correct?
- 2019Where must a copy of the site-specific software be kept after installation or a program change?
- 2020After a program change on an existing system, what must happen to the record documentation?
- 2021Who is responsible for completing the record of completion for a new fire alarm installation?
- 2022When a performance-based design is used for detection in an atrium, what documentation must be provided?
- 2023Why must the assumptions of a performance-based detection design be recorded and kept with the system documents?
- 2024For an emergency communication system, what must happen to the risk analysis?
- 2025Which design documents must state the pathway survivability level used for each circuit of a voice evacuation system?
- 2026A voice system design treats storage closets as not requiring intelligible voice. Where must this decision be documented?
- 2031Which item should an ITM inspection and test record include?
- 2032A technician finds that 14 smoke detectors failed sensitivity testing. How should this be documented?
- 2033Shop drawings for an addition to an existing system are under review. Which item is needed to confirm the existing power supply can support the new devices?
- 2035Which piece of information should a Level IV reviewer verify is shown on the floor plans of fire alarm shop drawings?
- 2036Shop drawings show a riser diagram but no indication of conductor type and size. Why should the reviewer return them?
- 2037Which statement describes the security of system documentation under NFPA 72?
- 2038A new control unit is installed in a lobby. Under NFPA 72 (2022/2025), what mounting limits apply to its displays, indicators and controls unless the AHJ permits otherwise?
- 2039When reviewing shop drawings, why should the reviewer compare the control unit's listed equipment with the submitted devices?
- 2040A releasing system submittal is under review. Which item is most important to include?